Harrier Construction was engaged to transform a dated warehouse into a modern, functional space for Soul Educare – a hub designed to foster connection and community among youth. The brief required more than a refresh; it demanded structural upgrades, compliance, and a design that would stand the test of time.

Solution

The project presented several challenges that called for careful planning and sequencing.

  • Complex Groundworks
    Installing 6m piles adjacent to existing strip footings posed structural risk. Harrier Construction developed a contingency plan before drilling commenced. When larger than expected footings were encountered, this foresight allowed works to continue without delay, protecting both programme and structural integrity.

  • Mezzanine Installation Within an Existing Building
    Lifting and placing the mass timber mezzanine within a finished warehouse required precision. Harrier Construction prepared a detailed cranage methodology and coordinated closely with all trades to ensure safe, accurate installation without compromising completed surfaces.

  • Managing Long Lead Times
    The mezzanine had a 16-week lead time. To maintain momentum, Harrier Construction re-sequenced the programme, front-loading internal works such as services, ceiling grid, wall construction, and finishes. This approach kept the project on track and delivered within six months from contract award.

  • Sequencing Interdependent Structural Elements
    Structural steel, fire-rated walls, and the mezzanine were installed in a carefully planned sequence. Consultants and council inspectors were engaged at critical stages to ensure compliance and avoid rework.

  • Working Within Existing Constraints
    Tight tolerances demanded accuracy. On-site dimensions were measured and verified, with build-ups coordinated across trades to ensure procurement could proceed without delay.

Every decision reflected Harrier Construction’s ability to think broadly while delivering with precision.

Outcome

The result is a vibrant, compliant space that supports Soul Educare’s mission. Delivered on time and within budget, the project demonstrates Harrier Construction’s capability to manage complexity without compromise. A once-dated warehouse now serves as a dynamic hub for youth engagement – safe, functional, and inspiring.

 