Overview
Harrier Construction was engaged to transform a dated warehouse into a modern, functional space for Soul Educare – a hub designed to foster connection and community among youth. The brief required more than a refresh; it demanded structural upgrades, compliance, and a design that would stand the test of time.
Solution
The project presented several challenges that called for careful planning and sequencing.
Complex Groundworks
Installing 6m piles adjacent to existing strip footings posed structural risk. Harrier Construction developed a contingency plan before drilling commenced. When larger than expected footings were encountered, this foresight allowed works to continue without delay, protecting both programme and structural integrity.Mezzanine Installation Within an Existing Building
Lifting and placing the mass timber mezzanine within a finished warehouse required precision. Harrier Construction prepared a detailed cranage methodology and coordinated closely with all trades to ensure safe, accurate installation without compromising completed surfaces.Managing Long Lead Times
The mezzanine had a 16-week lead time. To maintain momentum, Harrier Construction re-sequenced the programme, front-loading internal works such as services, ceiling grid, wall construction, and finishes. This approach kept the project on track and delivered within six months from contract award.Sequencing Interdependent Structural Elements
Structural steel, fire-rated walls, and the mezzanine were installed in a carefully planned sequence. Consultants and council inspectors were engaged at critical stages to ensure compliance and avoid rework.Working Within Existing Constraints
Tight tolerances demanded accuracy. On-site dimensions were measured and verified, with build-ups coordinated across trades to ensure procurement could proceed without delay.
Every decision reflected Harrier Construction’s ability to think broadly while delivering with precision.
Outcome
The result is a vibrant, compliant space that supports Soul Educare’s mission. Delivered on time and within budget, the project demonstrates Harrier Construction’s capability to manage complexity without compromise. A once-dated warehouse now serves as a dynamic hub for youth engagement – safe, functional, and inspiring.